The Nammuldi switchroom was constructed at our Perth site and transferred to the mining site in 2 engineered sections to be joined and commissioned on site.
Completed2016Surface Area25.8 tonneLocationNammuldi, Western Australia
SCOPE
Electrical Substation – Length: 37m, Width: 5.3m, Height: 3m