Location: Brisbane Airport – Brisbane QLD

Tonnage: 40 Tonne

Project duration: November 2019 – December 2019

Sencova was given the job to build the Radar Tower in a short amount of time for the new parallel runway system at Brisbane Airport. Job completed and delivered on time.